Thursday October 3, 2024 | LANGFORD, BC
Also see: | Island Social Trends Traffic Updates Page
Expect traffic delays on Peatt Road, Larkhall Road and Claude Road in Langford during October 4 to 25.
This is for BC Hydro underground extension work, which requires boulevard and lane closure.
Work will be done during the hours of 7 am to 3 pm during which time there will be single-lane traffic.
“Work will be separated into multiple phases to minimize the traffic disruption,” says City of Langford Engineering in a traffic advisory.
Schedule:
Work will commence on Peatt Road, then continuing east onto Larkhill Road and completing on the north end of Claude Road.
While primarily a residential area, the Langford #1 Fire Hall is on Peatt Road and there is heavy local commuter traffic including for a local elementary school and retail services on nearby Goldstream Avenue.
Peatt Road is used as access at Veterans Memorial Parkway to get to Highway 1 (Millstream Interchange).
On-site traffic control:
Drivers are to follow signage within the construction zone. East side pedestrian access on Peatt Road and the south access on Larkhall Road will be closed.
Traffic control will be on-site directing traffic and assisting pedestrians.
Delays may be expected, says Langford Engineering. They ask that motorists be aware and they apologize for the inconvenience.
===== RELATED LANGFORD TRAFFIC NEWS:
- LANGFORD TRAFFIC: sewer extension in Glen Lake (August 26, 2024)
- TRAFFIC: Hwy 1 on BC Day long weekend (August 2, 2024)
- LANGFORD TRAFFIC: Leigh Rd & Langford Parkway (July 8, 2024)
- LANGFORD TRAFFIC: Goldstream & Jacklin water hydrant relocation (May 25, 2024)
- LANGFORD TRAFFIC: Peatt Rd delays April 15 & 16 (April 11, 2024)
- LANGFORD TRAFFIC: Jacklin Rd single-lane during concrete pour March 14 (March 11, 2024)
- LANGFORD TRAFFIC: single-lane on portion of Jacklin Rd to Aug 2025 (November 24, 2023)
- LANGFORD TRAFFIC: Bear Mountain Pkwy roadworks Sat Aug 26 (August 24, 2023)
- LANGFORD TRAFFIC: Paving on Chidlow Connector Aug 22 (August 21, 2023)
- Langford Traffic: Chidlow Connector now open (March 28, 2022)
- Langford Traffic: Chidlow Connector opens March 28 (March 24, 2022)
- Langford Traffic: Signal lights now active at Chidlow Connector (February 3, 2022)
- Langford Traffic: Chidlow Connector signal activation Feb 2 (January 25, 2022)
- Slegg portion of Chidlow Connector opens just before Christmas (December 23, 2021)
===== LINKS:
- Island Social Trends Traffic Page | includes local Drive BC webcams
- City of Langford – Traffic Advisories